viinCRM
  • 機能
  • デモを依頼
  • Pricing
  • 0
  • 0

  • English (US)  日本語  Tiếng Việt
  • サインイン
  • 今すぐ始める  
viinCRM
  • 0
  • 0
    • 機能
    • デモを依頼
    • Pricing

  • サインイン
  • English (US)  日本語  Tiếng Việt
  • 今すぐ始める  
  1. APPS
  2. Web Gantt 18.0
Web Gantt
Web Gantt

Web Gantt

by Viindoo

4.9

$ 14.76 $ 14.76
v 18.0 7
Live Demo
Lines of Code 5585
Technical name viin_web_gantt
License OPL-1
Website https://viindoo.com/apps/modules/18.0/viin_web_gantt?force_show=1
Read description for v 16.0 v 17.0 v 19.0
Extensions Viindoo Manufacturing Rental Management Project Scheduling Viin Fleet Booking Gantt Freight Project Gantt Scrum Project Scheduling Viin Fleet Operation Gantt
  • Description
  • License
Viindoo Logo
Odoo Community
Viindoo Cloud

The Gantt view, for Odoo Community

A Gantt chart engine any model can use: bars from two datetime fields, dependencies, drag-to-reschedule and resource allocation warnings.

Web Gantt (technical name viin_web_gantt) is an Odoo 18.0 app for Odoo Community and Viindoo Cloud, built for project manager, dispatcher, developer, management.

The Gantt view, for Odoo Community

At a Glance

The facts of Web Gantt, version 0.1.2, in one place. Published by Viindoo.

Technical name
viin_web_gantt
Odoo version
18.0 (Odoo Community, Viindoo Cloud)
Category
Hidden
Depends on
web
Adds
1 new model, 3 extended models
Licence
OPL-1
Best for
Project manager; Dispatcher; Developer; Management
Not for
It is a view engine.
Last updated
2026-09-09
Key features
A Gantt view type for Community, Bars from a start and an end datetime field, Dependencies drawn between records, Rescheduling by dragging, written back to the record, Resource allocation warnings, A mixin so any model can adopt it
Live demo
v18demo-int.viindoo.com
  • Features
  • Demo
  • Support
  • Releases

How It Works

Two of the models it is used on.

1

Project tasks

Planned start and end per task, with the dependencies between them.

Tasks in Gantt view
2

Fleet trips

The same engine over a completely different model.

Trips in Gantt view

What You Get

A Gantt view type for Community

Bars from a start and an end datetime field

Dependencies drawn between records

Rescheduling by dragging, written back to the record

Resource allocation warnings

A mixin so any model can adopt it

More Screens

Everything below was taken on a database seeded with real business data, on this series - not a mock-up and not a screenshot from an older version.

Trips

Trips

What This App Does Not Do

Read this before you buy. Everything below is something the app deliberately leaves to another app or to you.

It is a view engine.

What it plans depends on the module that declares the view.

It needs start and end fields.

A record with one date is a calendar entry, not a bar.

It does not level resources.

It warns; deciding is human.

No critical path.

Dependencies are drawn, not solved.

Works Well With

Apps from the same stack, built to fit this one:

Project Gantt

The project planning built on it.

Project Scheduling

Fleet Planning

Dispatch on the same engine.

Fleet Operations

Cohort View

The other Enterprise view brought to Community.

Viin Cohort View

Who Should Use Web Gantt?

Project manager

Plans in the view planning is done in.

Dispatcher

Sees the day's trips as a timeline.

Developer

Adds a Gantt view instead of explaining that it is Enterprise-only.

Management

Reads a plan rather than a list of dates.

Frequently Asked Questions

What does Web Gantt do?

A Gantt chart engine any model can use: bars from two datetime fields, dependencies, drag-to-reschedule and resource allocation warnings.

What does Web Gantt not do?

It is a view engine. What it plans depends on the module that declares the view. It needs start and end fields. A record with one date is a calendar entry, not a bar. It does not level resources. It warns; deciding is human. No critical path. Dependencies are drawn, not solved.

Who is Web Gantt for?

Project manager: Plans in the view planning is done in. Dispatcher: Sees the day's trips as a timeline. Developer: Adds a Gantt view instead of explaining that it is Enterprise-only. Management: Reads a plan rather than a list of dates.

Which Odoo version and editions does it support?

Odoo 18.0 - Odoo Community, Viindoo Cloud. Upgrades to a newer Odoo series are a separate purchase for that series.

What does it depend on?

It installs on top of: web. Odoo installs them with it.

How do I set it up?

Two of the models it is used on.

What works well with it?

Project Gantt (viin_project_gantt): The project planning built on it. Fleet Planning (viin_fleet_planning): Dispatch on the same engine. Cohort View (viin_web_cohort): The other Enterprise view brought to Community.

Can I try it before buying?

Yes - the Live Preview button at the top of this page opens the module's own screen on a working database.

How do I get support?

Write to apps.support@viindoo.com with your Odoo version and the technical name viin_web_gantt; pre-sales questions go to sales@viindoo.com.

See Web Gantt in Action

Live demo: v18demo-int.viindoo.com/odoo/action-project.action_view_all_task
or use the Live Preview button at the top of this page

Need help with Web Gantt?

For questions, implementation support or a custom feature, contact Viindoo.

Pre-Sales & Partnership

sales@viindoo.com

Technical Support

apps.support@viindoo.com

Answered within one working day.

Upgrades to a newer Odoo series are a separate purchase for that series.

All Viindoo apps: Viindoo Apps

About Viindoo. Viindoo builds and maintains more than 1,000 apps on the Odoo App Store for the Community and Enterprise editions and runs them on Viindoo Cloud. A purchase of Web Gantt covers the 18.0 series: bug fixes on the module reach you through the store, questions go to apps.support@viindoo.com with the technical name viin_web_gantt, and moving to a newer Odoo series is a separate purchase for that series. Source code is delivered with the module and stays yours to read and adapt.

Technical Requirement

Editions: Odoo Community, Viindoo Cloud
License: OPL-1

Changes log

0.1.2 - Latest on the 18.0 line

  • Fix wrong quarter/date labels and dead default_order_by arch attr.
  • Give every task row its real res_model.
  • Resequence through the rpc service, not raw jsonrpc.
  • Replace tree with list.
  • Stop a drag writing what the user never changed.

This software and associated files (the "Software") may only be used (executed, modified, executed after modifications) if you have purchased a valid license from the authors, typically via Odoo Apps, or if you have received a written agreement from the authors of the Software (see the COPYRIGHT file).

You may develop Odoo modules that use the Software as a library (typically by depending on it, importing it and using its resources), but without copying any source code or material from the Software. You may distribute those modules under the license of your choice, provided that this license is compatible with the terms of the Odoo Proprietary License (For example: LGPL, MIT, or proprietary licenses similar to this one).

It is forbidden to publish, distribute, sublicense, or sell copies of the Software or modified copies of the Software.

The above copyright notice and this permission notice must be included in all copies or substantial portions of the Software.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE.

Viindoo Logo

Truyền thông xã hội


クイックリンク

  • viinCRM
  • Demos
  • Viindoo ERP

リソース

  • ドキュメント
  • マーケットプレイス

Viindooについて

  • 会社情報
  • 導入企業

著作権はViindooテクノロジー株式会社に帰属します

English (US) English (US)  日本語 日本語  Tiếng Việt Tiếng Việt
Powered by Viindoo - Create a free website

私たちはクッキーでより良いユーザー体験をご提供いたします クッキーポリシー

必須のみ 同意